Spotlight: TEPCO, gov't still grappling with myriad problems 8 years after Fukushima disaster

Source: Xinhua| 2019-03-11 17:46:39|Editor: Lu Hui
Video PlayerClose

TOKYO, March 11 (Xinhua) -- Eight years after one of the worst nuclear disasters in history, the Japanese government and the utility it is responsible for are still battling the crisis which has yet to be brought under control.

The lack of progress is not just reflected in there being no clear roadmap for the decommissioning of the stricken Daichi nuclear power plant in Fukushima Prefecture, but can also be seen in an ongoing social crisis.

Thousands are still struggling in temporary housing and unable to reboot the once flourishing businesses, in regions hardest hit by the nuclear crisis, which was triggered by a massive 9.0-magnitude earthquake and ensuing tsunami severely damaging three reactors at the Daiichi facility.

The damaged reactors suffered core meltdowns after their key cooling systems were knocked out and backup power supplies were rendered useless.

Tokyo Electric Power Company Holdings Inc. (TEPCO), operator of the still crippled Fukushima plant, has since successfully decommissioned the Number 5 and Number 6 reactors at the plant, and removed a significant number of fuel rods in the Number 4 reactor and safely stored them.

But, TEPCO has struggled to come to terms with removing the melted nuclear fuel and debris from the Number 1 to Number 3 reactors, which is making an overall blueprint for the plant's decommissioning a seemingly impossible task for the government.

TEPCO has recently attempted to make direct contact with the melted fuel at the bottom of one of the crippled reactors by using a robotic device that can grip onto objects.

But while the device was able to make contact with the fuel, it was unable to confirm whether the accumulated fuel could be extracted or not.

Prior to this, the embattled utility had said that even with the device's supposed capacity to grip objects weighing up to 2 kg and carry a camera and a radiation detector, it will not extract a sample of nuclear deposits until the second half of next fiscal year.

Past attempts to conduct surveys in the crippled reactors have involved TEPCO sending self-propelled robots to explore the inside of the reactors and capture and send information about the melted nuclear fuel debris so that the utility can decide how to remove it.

An attempt to send a shape-shifting, camera-equipped robot into the reactor was cancelled, however, as camera images outside the containment vessel used to monitor the robot could not be seen on the control room's screen.

Prior to this, a similar failed attempt to retrieve data from inside the damaged Number 2 reactor occurred due to the robot malfunctioning, likely due to exceedingly high levels of radiation.

The continued failures by TEPCO to retrieve the necessary data on the high levels of radiation, the temperature, and the amount and locations of melted fuel and nuclear debris from the damaged reactors, are complicating plans to decommission the plant.

TEPCO and the government have said in their most recent analysis of the situation that the exact plan as to when and where to begin the decommissioning process has yet to be decided.

The decision on which reactor will be the first to have its spent nuclear fuel removed will be decided within fiscal 2019, they had initially said.

The removal of the spent fuel, assuming suitable technology can be developed, is expected to start in 2021, the government and the utility have tentatively decided.

Independent experts on the matter, however, believe that this timeframe is overly optimistic considering the sluggish pace at which the utility and government have been moving up until now to overcome key problems at the plant.

In addition, TEPCO, since the crisis began to date, is still grappling with storing contaminated water at the facility, as coolant water is continually being poured over the radioactive debris, yet is mixing with groundwater which flows into the facility from the plant's surrounding hills.

The contaminated groundwater has been allowed to flow freely into the Pacific Ocean, much to the consternation of the international community who remain skeptical about TEPCO's reporting of radiation levels, owing to a number of bungled practices and cover-ups widely reported over the past eight years.

Japan's nuclear authority has said that once the contaminated water from the plant has been diluted enough, it will be released into the Pacific Ocean, yet no roadmap or deadline for the procedure, which is staunchly opposed by local fishing industries, has been put forward.

The overall decommissioning of the plant, hence, is expected to take decades.

Meanwhile, the government-backed ceremony held on Monday at the National Theater in Tokyo, where a moment's silence was observed to remember the victims of the disaster, likely did little to instill faith in the 50,000 evacuees who have been unable to return to their homes because of the disaster, which, overall claimed the lives of a confirmed 15,897 people.

According to the latest figures, around 47,000 people were forced from their homes in the days and weeks following the triple disasters, and 2,533 are still considered missing or unaccounted for.

Another 3,701 have died owing to post-disaster health conditions, the National Police Agency here said, as of March 8.

Regarding the current 50,000 evacuees, construction of new housing projects has, unfathomably, yet to be completed.

The government has said it will disband the Reconstruction Agency that was formed a year after the disasters to ensure that reconstruction work was proceeded in a coordinated and consolidated fashion.

However, according to local media, in the hardest-hit prefectures, around 1,300 people are still living in temporary accommodation as there have been delays in the building of new residences.

The delays have been caused by the allocation of funds for such projects not being handled effectively and further stalled due to bureaucratic issues, as well as those of a fraudulent nature.

Compounding such myriad problems on a social level, is the fact that eight years now marks the time for loans given out by municipalities to help individuals and local businesses rebuild to be paid back.

Owing to the stigmas still associated with radiation, those who did move back to areas once affected by the meltdowns, particularly those working in the farming or agricultural businesses, have struggled to find their feet, due to bans and external concerns about produce coming from Fukushima.

In addition, in Fukushima, there are a number of municipalities that are still deemed uninhabitable and remained cordoned off as radioactive waste continues to be piled up on the sides of the streets.

This is after hustled clean up operations, in the first few years after the plant's meltdowns, saw contaminated waste hastily stored in thin black plastic bags with plans for their treatment and proper disposal still, as yet, undetermined.

TOP STORIES
EDITOR’S CHOICE
MOST VIEWED
EXPLORE XINHUANET
010020070750000000000000011102351378862361
彩神彩票 大发app 凤凰彩票app 乐发iv游戏平台 凤凰彩票大厅 乐发彩票 乐发彩票app下载 大发彩票 乐发v官网 乐发lll 乐发lv入口 乐发iv首页 乐发ll登录 凤凰彩票大厅 乐发官网 乐发ii下载入口 乐发ll 乐发v平台 乐发v官网 乐发lll 乐发lv入口 乐发iv首页 乐发ll登录 乐发lv 乐发lll安装 乐发lv 乐发登录入口 乐发iv游戏平台 凤凰彩票登录 网信彩票 彩神 彩神彩票官方网站 彩神彩票官网首页 彩神官方app下载安卓版 凤凰彩票登录 彩神v3 凤凰彩票app下载 彩神官方app下载安卓版 网信快三 一分快3 快三彩票购彩平台 凤凰彩票官方 快3官网 网信彩票 快3app 网信彩票平台 百姓彩票平台 网信平台官网 快3app下载 百姓彩票 每日彩票 快3app 百姓彩票 每日彩票 快3app 百姓彩票平台 幸运5分彩快3 快3彩票app下载 百姓彩票网站网址 大发10分PK10 快3下载 网信彩票平台 网信平台官网 快3彩票官网app 凤凰彩票官方 彩神彩票 大发10分PK10 彩神v3 大发彩票app下载 百姓彩票网站网址 彩神购彩平台 每日彩票 官方正规快三彩票平台 彩神彩票购彩平台 百姓彩票 凤凰彩票购彩平台 凤凰彩票app下载 彩神官方app下载安卓版 网信快三 一分快3 快三彩票购彩平台 凤凰彩票官方 彩神彩票 大发10分PK10 彩神v3 凤凰彩票登录 乐发lv 乐发∨Il 百姓彩票网站网址 乐发彩票 乐发彩票官方网站 乐发lll安装 百姓彩票网站网址 凤凰彩票app下载 大发10分PK10 乐发2 乐发app 凤凰彩票 大发彩票app 乐发登录入口 乐发ll登录 乐发v官网 乐发官网 大发彩票app下载 凤凰彩票购彩平台 彩神彩票 官方正规快三彩票平台 一分快3 百姓彩票网站网址 凤凰彩票app下载 大发10分PK10 乐发2 乐发app 凤凰彩票 大发彩票app 乐发登录入口 乐发ll登录 乐发v官网 乐发官网 大发彩票app下载 凤凰彩票购彩平台 彩神彩票 官方正规快三彩票平台 1分快三平台 百姓彩票平台 凤凰彩票登录 幸运5分彩快3 彩神 乐发彩票 乐发 大发彩票 乐发iv游戏平台 乐发lv 乐发lll 乐发ii下载入口 乐发彩票官方网站 凤凰彩票官方网站 凤凰快3 彩神彩票官网首页 1分快三平台 百姓彩票平台 凤凰彩票登录 幸运5分彩快3 彩神 乐发彩票 乐发 大发彩票 乐发iv游戏平台 乐发lv 凤凰彩票app 乐发app 网信彩票平台 网信彩票平台 乐发iv游戏平台 凤凰彩票app 乐发lv 乐发彩票app下载 凤凰彩票app 网信彩票平台 乐发彩票app下载 乐发lv 乐发app 大发彩票安卓下载 大发彩票安卓下载 大发彩票 乐发彩票app下载 网信彩票平台 乐发iv游戏平台 彩神彩票 乐发彩票中心 极速快3彩票平台 人人快三凤凰 大发彩票app 大发彩票大全 乐发彩票 彩神彩票官方网站 乐发app 酷天堂彩票平台 凤凰彩票app下载 凤凰彩票大厅 凤凰彩票app 极速快3彩票平台 凤凰彩票 凤凰快3 乐发ll官网 乐发彩票中心 正规快三送彩金平台 凤凰彩票官方 乐发ll 乐发 网信彩票 彩神彩票 彩神彩票官方网站 大发彩票app 网信彩票用户 百姓快三 百姓彩票平台 乐发lv 乐发彩票app下载 彩信平台 网信彩票 乐发彩票官方网站 乐发∨Il 人人快三凤凰 凤凰彩票 凤凰快3 乐发ll官网 乐发彩票中心 正规快三送彩金平台 凤凰彩票官方 乐发ll 乐发 网信彩票 彩神彩票 彩神彩票官方网站 人人快三凤凰 乐发彩票 彩神彩票 乐发iv游戏平台 乐发彩票 大发彩票中心 凤凰彩票登录 凤凰彩票app 彩神彩票 大发彩票 乐发ll 大发彩票app 凤凰快3 凤凰彩票 彩神彩票 乐发ll 凤凰彩票 乐发lll 凤凰彩票大厅 网信彩票 彩神彩票 乐发lv 快盈彩票 乐发彩票官方网站 盈彩网投资平台 大发官网 一分时时彩 乐发lv 快3平台 凤凰快3 乐发ll 全民彩票 乐发彩票官方网站 百姓彩票 乐发彩票 大发彩票 极速快3 乐发app 大发官网 乐发lll 快3平台 凤凰快3 乐发ll 全民彩票 乐发彩票官方网站 百姓彩票 乐发彩票 大发彩票 极速快3 乐发app 彩神iv 大发彩票app 大小单双平台 一分pk10 乐发lv 快盈彩票 乐发官网 快彩彩票 百姓彩票 凤凰彩票大厅 网信彩票 乐发彩票中心 网信快3 乐发 彩神xl 三分快3 大发彩票 大发官网 乐发lll 快3平台 凤凰快3 乐发ll 全民彩票 乐发彩票官方网站 百姓彩票 乐发彩票 乐发彩票官方网站 大发彩票 乐发 分分快3 彩神vl 55世纪 55世纪 凤凰快3 乐发彩票 乐发lv welcome凤凰彩票 乐发ll 1分快3 彩神 彩神ll 1分快3官网 1分快3的平台 welcome凤凰彩票 三分快3 彩神x 彩神vl 凤凰彩票 彩神xl 大发彩票 凤凰彩票大厅 乐发官网 乐发ll 乐发lll 乐发lv 大发彩票app 大发彩票 乐发 乐发彩票 乐发彩票中心 凤凰快3 乐发彩票 彩神xl 腾讯快3 大发彩票 彩神xl 大发彩票 乐发彩票 大发彩票app 快3平台 乐发 1分快3 乐发彩票 彩神x 凤凰快3 彩神xl 彩吧助手 大发彩票app 快3平台 大发排列3 彩神iv 彩神vl 乐发IV 彩神x 一分pk10 大发排列3 乐发lv 快3彩票 乐发app下载 三分快3 快三平台助手 乐发彩票ll 彩神iv 乐发lll下载 盈彩网投资平台 乐发Ⅲ 一分pk10 凤凰彩票 乐发Vll 大发官网 乐发ll 大发彩票 乐发1 凤凰快3 彩神vl 乐发lx 百姓彩票 乐发VI 彩神x 乐发IV 极速快3 乐发 凤凰快3 网信快3 乐发lv 快3彩票 乐发app下载 三分快3 快三平台助手 乐发彩票ll 彩神iv 乐发lll下载 盈彩网投资平台 乐发Ⅲ 凤凰彩票大厅 乐发lv 乐发lv 乐发lv 凤凰彩票 大发彩票 大发彩票 凤凰彩票 乐发lv 凤凰彩票 凤凰彩票 乐发lv 乐发ll 凤凰彩票app下载 凤凰彩票 凤凰彩票 乐发lv 乐发ll 凤凰彩票app下载 凤凰彩票 凤凰彩票 乐发lv 彩神x 乐发 乐发ll 极速快3 乐发lv 乐发彩票中心 快3彩票 凤凰彩票大厅 彩神x 凤凰彩票app 分分快3 网信彩票 网盟彩票 凤凰彩票 百姓彩票 乐发 快彩彩票 乐发彩票 快3平台 百姓彩票 大小单双平台 凤凰快3 彩神xl 一分pk10 乐发lv 三分快3 大发彩票 乐发彩票 快3平台 百姓彩票 大小单双平台 凤凰快3 彩神xl 一分pk10 乐发lv 三分快3 大发彩票 极速快3 乐发ll 网信彩票 乐发lv 全民彩票 凤凰彩票app下载 快盈彩票 大发彩票app 大发官网 凤凰彩票 彩神iv 大发彩票 网信快3 凤凰彩票 百姓彩票